32 projects. One year.

A prototype makes a discussion concrete. At AstraZeneca, I learned the workflows, wrote requirements, designed interfaces, and built prototypes the team could review. I revised them with business owners and engineers. ECS built the risk register from my requirements and released it in March 2026. Other examples here show prototype decisions, including services and approval rules that still needed to be connected.

View original
Original Figma prototype showing a compact risk register with search, risk categories, status, and priority alongside collapsible navigation.

This is my Figma prototype, with the risk list and its filters on one screen. ECS built the Power Apps product from my requirements and released it in March 2026.

Source: Oncology Risk Dashboard, Figma version 33; original exported prototype with sample records, captured 20 September 2026

Five closer looks at the work

Five illustrated stories from the work. The complete 32-entry index follows below.

  1. Risk register prototype with the selected risk open beside the full register.View original
    Original prototype · sample data

    Launched

    A risk register for US Oncology Compliance

    My contribution
    I wrote the requirements, prototyped the interface and coordinated business testing with the Compliance owner and ECS.
    Where it landed
    ECS built the first release in Power Apps. It went live in March 2026.
    Explore Risk register
  2. Policy exception prototype comparing ways to record a committee decision.View original
    Policy review artifact

    Proposed

    Record the decision. Don't make it.

    My contribution
    I specified intake and access rules, mapped two research-review processes and made prototypes for the open decisions.
    Where it landed
    The policy exception workflow had not been approved by my last spec.
    Explore Compliance reviews
  3. Newer AI Workbench frontend prototype with a task prompt and five workspace launchers.View original
    Original frontend prototype · fixture data

    Working product

    Designing review into AI-drafted slides

    My contribution
    I designed and built the shared frontend prototypes, narrowed medical use cases, shaped the backlog and put review points into the workflow.
    Where it landed
    The Workbench was a working product. These sample-data screens show the interface and review ideas I developed within it.
    Explore AI Workbench
  4. Component library sheet showing brand, product and agent interface patterns.View original
    Retrospective design exploration

    Pilot

    One prototyper, about ten engineering teams

    My contribution
    I gave engineers shared tokens and components, with rules for brand conflicts and a first pilot team.
    Where it landed
    Recorded adoption outside the system repository stayed small.
    Explore Design system
  5. Forecasting prototype showing a sensitivity analysis interface.View original
    Original forecasting prototype

    Prototype decisions

    AI prototypes as cheap tests

    My contribution
    I built interface prototypes to test a specific question before teams committed to a build.
    Where it landed
    For the forecasting prototype, the leads handed off the non-AI core and deferred its AI layer.
    Explore AI prototypes

August 2025 — August 2026

Follow the work.

32 documented entries across project families, features and shared foundations. Pick a thread, inspect the work, then follow the decision behind it. These are not 32 independently shipped products.

32 of 32 entries

Compliance and governance5

Field and commercial experiences8

Assistants and operational tools6

Global Medical Affairs Workbench10

The shared foundation3

21 / 32Feature / program output

Slide builder

Jul to Aug 2026

Part of

Six-part slide storyline beside a branded medical slide draft.Open full size
Original Slide Builder prototype · invented contentReview the storyline, draft the slides, then require scientific approval before export.

My contribution

Designed review steps for the medical slide builder.

What this shows

This August 3 artifact shows prototype review gates. It does not demonstrate a connected scientific approval or generation service.

Read the decision and full story

What moved forward

August 2025 to August 2026 · US Oncology, then Global Medical Affairs from May 2026

Mar 26

Risk register released

I wrote the requirements and prototyped the interface. ECS built and released the Power Apps product.

See the risk register work
43 / 32

Observed, then fixed

Business testing logged 43 observations in four days. ECS fixed 32 during that window.

See the testing and release
9 → 3

A smaller demo recommendation

I estimated nine Workbench features at 14 to 26 person-weeks against about two available. I recommended building three. I have no record that the program adopted the recommendation.

See the Workbench decisions

Resume and contact

Want the short version or to talk through the work?

Email me Download resume Bowman.stephen92@gmail.com